Project 14 | Declan Buckley | Highbury
A large build based in North London required mass excavations of over ninety cubic meters of soil prior to landscape work proceeding. The excavations gave access to the new basement level conservatory and secluded lower terrace & steps laid with Blanc de Bierge paving. The new walkway with underside storage is lined with toughened safety glass and stainless steel supports. The upper terrace is laid with Breedon semi-compacting gravel surrounded by structured planting on two levels.